Major Equipment Detail Status
| Equipment Name |
Specification |
Q’ty |
Installed Year |
| Basket Elevator |
40h/rX 7.5kva |
1Unit |
2020 |
| Belt Conveyor |
500wX 10,000lX5kva |
1Unit |
2020 |
| Shot Ball Tank |
30ton |
1Unit |
2020 |
| Separator |
40h/rX5kva |
1Unit |
2020 |
| Screw Conveyor |
300dX2,000lX5kva |
1Unit |
2020 |
| Chopper |
2,000wX10,000l |
1Unit |
2020 |
| mixing M/C |
1tankX1노즐X2set |
1Unit |
2020 |
| Dust Collector (incl. Hood & Duct) |
600㎥ |
1Unit |
2020 |
| Vibration Speed Door |
20,000wX5,000h |
1Unit |
2020 |
| Equipment Name |
Specification |
Q’ty |
Installed Year |
| AC Tower (incl. Hood & Duct) | 1,000㎥ | 1Unit | 2020 |
| Shelter Saddle Device | 250d X6,000lX5kva | 1Unit | 2020 |
| Compressor (incl. Piping) | 100hpX2set | 1Unit | 2020 |
| Compressor (incl. Piping) | 50hp | 1Unit | 2020 |
| Shelter Speed Door | 20,000wX5,000h | 1Unit | 2020 |
| Equipment Name |
Specification |
Q’ty |
Installed Year |
| Lasor Cutting M/C |
WIND25040(4M x 25M) |
2Unit |
2015 |
| Lasor Cutting M/C |
WIND8025(2.5M x 8M) |
2Unit |
2015 |
| Bending M/C |
NCB25030(3M) |
1Unit |
2015 |
| Bending M/C |
NCB60060(6M) |
1Unit |
2015 |
| Bending M/C |
NCB250020(20M) |
1Unit |
2015 |
| CNC Drill |
NewRum13(1300 x 600MM) |
1Unit |
2015 |
| CNC Drill |
NewRum10S(1000 x 500MM) |
2Unit |
2015 |
| Band Saw |
Diamond 1300T(1300 x 600MM) |
1Unit |
2015 |
| Band Saw |
Diamond 1000T(1000 x 600MM) |
2Unit |
2015 |
| Beam Beveling M/C |
9MM x 3600MM |
1Unit |
2015 |
| Conveyor System |
Korea System W Line |
1Unit |
2015 |
| CNC Punching M/C |
KTPK-100(테이블 2M) |
2Unit |
2015 |
| Steel Cutting M/C |
TYC-HD42A(Portable) |
2Unit |
2015 |
| Steel Bending M/C |
TYB-D35A(Portable) |
1Unit |
2015 |
| Steel Beveling M/C |
9MM x 36MM |
2Unit |
2015 |
| Magnetic Crane |
Plate Lifting Magnet 자석 Type |
3Unit |
2015 |
| CO2 Welding M/C |
HDAUTO 600M(600A) |
200Unit |
2015 |
| Gouging M/C |
HYCUT 1000(1,000A) |
3Unit |
2015 |
| CNC Gas Cutting M/C |
4M x 36M |
1Unit |
2015 |
| CNC Plasma Cutting M/C |
4M x 36M |
1Unit |
2015 |
| Compressor |
AS10X(100HP) |
4Unit |
2015 |
| Forklift Truck |
160D9(16T) |
1Unit |
2015 |
| Forklift Truck |
80D9(8T) |
2Unit |
2015 |
| 지게차 |
30B-96(3T) |
3Unit |
2015 |
| Lattice Table 1 |
Area : 10,320m2(H 0.8M)M Horizontal 30M x Vertical 344M |
1Unit |
2015 |
| Lattice Table 2 |
Area : 18,705m2(H 0.3M Horizontal 37.5M x Vertical 430M Horizontal 86M x Vertical 30M |
1Unit |
2015 |
| Equipment Name |
Specification |
Q’ty |
Installed Year |
| OVERHEAD CRANE |
20ton |
6Unit |
2020 |
| OVERHEAD CRANE |
15ton |
3Unit |
2020 |
| OVERHEAD CRANE |
10ton |
1Unit |
2020 |
| OVERHEAD CRANE |
28ton |
4Unit |
2020 |
| GANTRY CRANE |
15ton |
2Unit |
2020 |